P.K.S/ONT/060/2024/2025

PROPOSED CONSTRUCTION AND EQUIPPING OF TWO CLASSROOMS WITH A SUSPENDED SLAB ON THE SECOND FLOOR WITH A STAIR CASE (PHASE III) AT PCEA KARAI DAY SECONDARY SCHOOL IN KIKUYU CONSTITUENCY

KShs 3,000.00

Quantity

Description

PROPOSED CONSTRUCTION AND EQUIPPING OF TWO CLASSROOMS WITH A SUSPENDED SLAB ON THE SECOND FLOOR WITH A STAIR CASE (PHASE III) AT PCEA KARAI DAY SECONDARY SCHOOL IN KIKUYU CONSTITUENCY

Reviews

There are no reviews yet.

Be the first to review “P.K.S/ONT/060/2024/2025”

Your email address will not be published. Required fields are marked *