NG-CDF/WDY/CK/001/2024-2025
PROPOSED CONSTRUCTION OF 8 DOOR BOYS TOILET AT CANON KITURI SECONDARY SCHOOL
KShs 3,000.00
Description
PROPOSED CONSTRUCTION OF 8 DOOR BOYS TOILET AT CANON KITURI SECONDARY SCHOOL
Be the first to review “NG-CDF/WDY/CK/001/2024-2025” Cancel reply
Reviews
There are no reviews yet.