Kenha/R3/460/2024
Construction of cheptobor Box Culvert at Km 22+200 Along Biretwo Arror (B70) Road
KShs 3,000.00
Description
Construction of cheptobor Box Culvert at Km 22+200 Along Biretwo Arror (B70) Road
Be the first to review “Kenha/R3/460/2024” Cancel reply
Reviews
There are no reviews yet.