KShs 3,000.00
214844
THE PROPOSED BOREHOLE DRILLING, EQUIPPING. WATER TOWER INSTALLATION, ELEVATION OF 1NO. 20M3 DOUBLE LAYERED PLASTIC TANK AND CONSTRUCTION OF 2NO. WATER COLLECTION POINTS AT OKOTA PRIMARY SCHOOL AND DENGA SCHOOLS SITUATED IN HOMABAY COUNTY