WCG/OT/EF/01/2024-2025
PROPOSED DRILLING AND EQUIPPING OF BOREHOLE, PIPELINE EXTENSION, FABRICATION OF TOWER AND TANK, CONSTRUCTION OF COMMUNITY WATER POINT AND 2NO ANIMAL TROUGHS AT LEHELEY
KShs 3,000.00
Description
PROPOSED DRILLING AND EQUIPPING OF BOREHOLE, PIPELINE EXTENSION, FABRICATION OF TOWER AND TANK, CONSTRUCTION OF COMMUNITY WATER POINT AND 2NO ANIMAL TROUGHS AT LEHELEY
Be the first to review “WCG/OT/EF/01/2024-2025” Cancel reply
Reviews
There are no reviews yet.