WCG/OT/EF/05/2024-2025

PROPOSED CONSTRUCTION OF A 10M HIGH OF 50METRE CUBIC ELEVATED STEEL WATER TANK AND 4KM WATER PIPING DISTRIBUTION LINES AT DADAJABULLA.

KShs 3,000.00

Quantity

Description

PROPOSED CONSTRUCTION OF A 10M HIGH OF 50METRE CUBIC ELEVATED STEEL WATER TANK AND 4KM WATER PIPING DISTRIBUTION LINES AT DADAJABULLA.

Reviews

There are no reviews yet.

Be the first to review “WCG/OT/EF/05/2024-2025”

Your email address will not be published. Required fields are marked *