CGK/WEEFNR/OT/FLLOCA/023/2024/2025

Proposed Construction of Distribution Pipeline at Kipkoita/Kapsoiyo Lastmile Connectivity at Kapsuser Ward

KShs 2,000.00

Quantity

Description

Proposed Construction of Distribution Pipeline at Kipkoita/Kapsoiyo Lastmile Connectivity at Kapsuser Ward

Reviews

There are no reviews yet.

Be the first to review “CGK/WEEFNR/OT/FLLOCA/023/2024/2025”

Your email address will not be published. Required fields are marked *